1
Energy Consultation!
with our Energy Tech to provide a system tailored for you!
2
Site Survey!
Our specialized surveyor will measure all roof surfaces, analyze your roofs integrity, monitory the sun hours & verify the initial designs for your custom system.
- You do not have to be home for this! Just make sure all gates & panels are unlocked and if you have pets make sure they are secured!
3
Design Plans
Our Engineering team takes the results from our specialized site surveyor & will prepare your plans to submit for your review.
- Official plans are submitted to your Jurisdiction
- We will email a copy of your plans!
4
Permitting/Utility
Once you select your design, our team will work with your local jurisdiction to ensure that all permitting, and utility procedures goes smoothly.
- Remember, our Solar Tech will be informing you with every milestone
5
Installation
BEST DAY HAS ARRIVED! This is where the fun begins! Installation dates are approximately 2 weeks after utility approval.
- You don’t even have to be home for installation (but its fun to watch!)
- Have all gates & electrical panels unlocked
- Ensure all pets are inside
- Ensure install team has access to all roof surfaces
6
Final Inspection
Almost at the finish line!
- The final inspection ensures that the plans we submitted for permitting were followed completely and immaculately.
7
Permission to operate
CONGRATULATIONS!! The day has arrived when your final inspection from your utility company will be giving the PTO (Permission to Operate) for your solar system!